The head of the Menoufia Water Authority inspects the Al-Bagour and Sirs El-Layan branch stations.
Engineer Rushdi El-Sayed Omar, Chairman of the Drinking Water and Sanitation Company in Menoufia, inspected the Sub-pumping Station No. 3 in Sirs El-Layan and the Jarwan Pumping Station in El-Bagour as part of his field tours to monitor the progress of work at the stations and to ensure the technical condition and regularity of operations at the station.
He stressed the need to carry out periodic maintenance of the station according to the existing time plan for equipment maintenance, in order to maintain its technical condition on a permanent basis, monitor the operation process, and pay attention to the general appearance of the stations in order to maintain the station’s efficiency and improve the quality of service provided to citizens.
This comes within the framework of the directives of Engineer Ahmed Gaber, Chairman of the Holding Company for Drinking Water and Sanitation, to the heads of the subsidiary companies to monitor the technical condition of the stations and to ensure reaching the best level of quality technically and administratively in order to achieve the public interest and improve the level of performance.