mcww@mcww.com.eg 048-2176423
  • Today, Major General Ibrahim Abu Limon, Governor of Menoufia, inspected the administrative headquarters of the Menoufia Drinking Water and Sanitation Company, in the presence of Eng. Rushdi Al-Sayed Omar, Chairman of the Board of Directors and Managing Director, to check the site’s implementation rates.
  • The company chairman pointed out that the building consists of a basement, a ground floor and 7 repeated floors on an area of ​​approximately 1200 square meters. It is being implemented in two phases. The first phase consists of constructing the concrete structure and the second phase consists of finishing works.
  • He added, the first phase has been completely completed (construction of the concrete structure and buildings) and the second phase is underway by tendering to a consulting office to prepare the necessary designs for the finishing. The contract was awarded to a consulting office (ECB) and the designs for finishing the building are currently being prepared. This comes within the framework of the efforts of His Excellency Major General Ibrahim Abu Limon, Governor of Menoufia, to achieve the dream of workers to have an administrative headquarters for them since the establishment of the company.