mcww@mcww.com.eg 048-2176423
  • In line with the directives of Major General Ibrahim Ahmed Abu Limon, Governor of Menoufia, and Engineer Mamdouh Raslan, Chairman of the Holding Company, regarding the necessity of field follow-up during the Eid Al-Adha holiday and raising the level of maximum preparedness at all water stations and networks within the governorate.
  • Today, Eng. Rushdi El-Sayed Omar, Chairman of the Menoufia Drinking Water and Wastewater Company, inspected the Sabk El-Ahad pumping stations, Ashmoun 2 pumping station, Ashmoun 3 pumping station, Samadoun 2 pumping station, Sabk El-Ahad treatment station, Shema and Tahway treatment station, Ashmoun filtration water station and Ramlet El-Angab artesian station to follow up on the progress of work and its regularity during Eid Al-Adha holiday.
  • He explained that a plan has been put in place to inspect drinking water and wastewater treatment plants in all parts of the governorate during Eid al-Adha to ensure the quality of wastewater and its compliance with health regulations before it is discharged into the drains, in order to preserve the environment and ensure the continuity of the provision of drinking water services with the required efficiency and quality.
  • He stressed the regularity of work at all stations and networks within the governorate, as well as the continuation of work on a shift system at all sites affiliated with the company to confront any problems that may arise in the networks and stations, especially problems related to the appearance of floods in the streets or the quality of water, and to work to solve them immediately.